Offshore ZLNG plant terminal extension
EPC water terminal extension: an approach bridge 407 metres long and 8.8 metres wide, and an offshore plant platform 276 metres long and 62 metres wide.
WhatsApp
A selection of our work: reclamation, piling, dredging, salvage and project cargo.
Ehsan Corporation is a Sandakan ship owning company with a record of port, jetty and reclamation work across Sabah. A major job on our record is the offshore ZLNG plant terminal extension in Sipitang. That terminal has an approach bridge 407 metres long and an offshore platform 276 by 62 metres. The Sapangar Bay Oil Terminal jetty extension was completed in November 2024. Piling for a bulk cargo terminal in Kudat, with the seabed dug to 15 metres, was completed in August 2024. At Grandis Wharf in Kota Kinabalu, the cofferdam needed 500,000 cubic metres of underwater backfilling. For example, in salvage work we recovered the grounded MV Aishah Aims 1 near Pulau Mengalum. With Sabah Fisheries Department, we anchored 30 recreational artificial reef units on 30 September 2024.


EPC water terminal extension: an approach bridge 407 metres long and 8.8 metres wide, and an offshore plant platform 276 metres long and 62 metres wide.

Reclamation, revetment, earthwork, piling and reinforced concrete works, with a petroleum product transfer facility. Completed November 2024.

A sheetpile cofferdam and 500,000 m³ of underwater backfilling, creating a dry, safe working area at sea.

Reclamation, revetment, piling and concrete works, with the seabed dug to 15 metres for vessels to load at the jetty. Completed August 2024.

Dredging and reclamation, seawall construction, quay deck and container yard works for the port expansion.

A grounded vessel with about 30 metric tons of cargo recovered: rudder and propeller removed, air balloons used as a moving slide cradle, underwater hot work and welding.

Plant and equipment for dredging and reclamation brought to site: heavy dredger equipment, barges, pontoons and pipelines.

Dredging and reclamation for a mixed commercial development, including long arm excavator and clamshell.

Sea piling to support construction on the island, carried out to the applicable standards.

Demolition of a 77 metre jetty, about 15 metres wide, followed by piling for the new structure.

Pontoons refloated from the seabed at two locations, eight spuds in total.

Dredging work at river mouths around Kota Kinabalu, 2023 to 2024.

Dredging work at Samur Jetty.

With the Sabah Fisheries Department: 30 recreational reef units anchored on 30 September 2024.

Maintenance work for buoys owned by the Malaysia Marine Department within Sabah territorial waters.

Six transformers of 150 MT, 60 MT and 40 MT moved by multi-axle trailers and low-loaders.